Ch 0215 / 44
Step 02.15 — Line the four M5 T-nuts up under the deck holes and stop there¶
Step 15 of 44 · Chapter 02 — Z drives, Z idlers, Z rails, deck panel
Tap to enlarge
Parts:
- the four deck T-nuts · already on the bench
Do:
- Slide each T-nut directly under one of the four deck-panel holes, then leave them there.
- No bolts and no DIN rails yet: both go on in Ch 09 Step 09.5.
Check
Four T-nuts visible through the four deck holes, free to nudge but not lost inside an extrusion. Panel sitting flat, unbolted, notch to the back.
What you're looking at
Manual p.29: the four T-nuts sitting under the four holes in the deck, and nothing else. The bolts that go through those holes also clamp the two DIN rails that carry the electronics, so they belong to one step in Ch 09.
Tip
If a DIN rail's own slots will not line up when you get there, Ch 09 shortens the DIN rail rather than moving the panel. src
Source: Voron manual p.29 · LDO wiring guide § Installing the DIN Rails and Wire Ducts