Skip to content

Batch B02 — Accent parts (blue)

Time: 21.9 h · Sessions: 3 plate starts · Steps: 9

Start the chapter · Resume · Read the whole chapter on one page

Gather per session — what to lay out before each bench segment.

  • Steps B02.1–B02.3 · ~5 min — [a]_stealthburner_main_body — from bin 08-SB · [a]_faceplate — from bin 10-tft · [a]_cable_cover — from bin 07-X · [a]_z_drive_baseplate_a ×2 — from bin 02-Z0, 02-Z2 · [a]_z_drive_baseplate_b — 7.0 h, 90 g (PrusaSlicer 2.9.6 estimate) ×2 — from bin 02-Z1, 02-Z3
  • Steps B02.4–B02.5 · ~5 min — Handle — from bin 11-door · [a]_fan_grill_a ×2 — from bin 11-fans · [a]_fan_grill_b ×2 — from bin 11-fans · [a]_fan_grill_retainer ×2 — from bin 11-fans · [a]_belt_guard_a ×2 — from bin 11-fans · [a]_belt_guard_b ×2 — from bin 11-fans · [a]_tensioner_left — from bin 04-B · [a]_tensioner_right — 7.3 h, 93 g (PrusaSlicer 2.9.6 estimate) — from bin 04-A
  • Steps B02.6–B02.7 · ~5 min — the remaining accent parts, [a]_belt_tensioner_a ×2 — from bin 02-Z0, 02-Z2 · [a]_belt_tensioner_b ×2 — from bin 02-Z1, 02-Z3 · [a]_z_tensioner_9mm ×4 — from bin 02-Z0, 02-Z1, 02-Z2, 02-Z3 · [a]_z_chain_retainer_bracket ×2 — from bin 10-chains · [a]_endstop_pod_D2F_switch — from bin 05-XY · [a]_xy_joint_cable_bridge_2hole — from bin 05-XY · XY_cable_chain_bridge-Igus-3mm_backer — from bin 05-XY · [a]_z_belt_clip_lower ×4 — from bin 06-Z-joints · [a]_z_belt_clip_upper ×4 — from bin 05-XY · [a]_guidler_a — from bin 08-CW2 · [a]_guidler_b — from bin 08-CW2 · [a]_latch — from bin 08-CW2 · [a]_latch_shuttle — from bin 08-CW2 · [a]_pcb_spacer — from bin spare-alt · [a]_keystone_blank_insert ×2 — from bin 11-skirts · ldo_bestagon_insert — 7.6 h, 96 g (PrusaSlicer 2.9.6 estimate) — from bin 11-skirts
  • Step B02.8 · ~10 min — nothing to lay out
  • Step B02.9 · ~15 min — nothing to lay out

← Batch B01 · Manual index · Batch B03 →