Batch B00 — Calibration & jigs¶
Start the chapter · Resume · Read the whole chapter on one page
Step B00.0One-time PrusaSlicer setup
NoteBefore B00: belt and hot-bed checks
Step B00.8Review every plate in PrusaSlicer, togetherwith a helper
Step B00.5Inspect: Gate A (the cube, no kit needed)with a helper
Gather per session — what to lay out before each bench segment.
- Step B00.0 · ~10 min — nothing to lay out
- Step B00.8 · ~20 min — nothing to lay out
- Step B00.1 · ~10 min — nothing to lay out
- Steps B00.2–B00.5 · ~15 min — 6 files, 8 objects — 4.0 h, 52 g (PrusaSlicer 2.9.6 estimate) ·
Voron_Design_Cube_v7— from bin 00-jigs ·Heatset_Practice— from bin 00-jigs ·MGN12_rail_guide_x2×2 — from bin 00-jigs ·MGN9_rail_guide_x2×2 — from bin 00-jigs ·pulley_jig— from bin 00-jigs ·z_drive_retainer_a_x2×1 — from bin 02-Z0, 02-Z2 - Step B00.6 · ~10 min — nothing to lay out
- Step B00.7 · ~15 min — nothing to lay out
