Skip to content
Ch 0518 / 48

Step 05.18 — Fit the second Y backer

Step 18 of 48 · Chapter 05 — Gantry: X and Y axes, XY joints, X carriage, titanium backers

Parts:

  • titanium Y backer ×1 · Ti backer set
  • M3×8 FHCS ×10 · Ti backer set
  • M3 roll-in T-nut ×10 · Fasteners, Tools & Misc box

Do: Repeat on the second C extrusion, again on the face opposite its rail. Lay the two finished Y assemblies side by side and confirm they match: rails facing the same way, backers facing the same way.

check Check

Both backers on the rail-opposite face, both flat. Their cable-chain pilot holes end up on the same side of the machine.

What you're looking at

The second Y extrusion, same treatment on its rail-opposite face. The first render shows one Y extrusion from underneath, rail face and backer face both in frame. The second shows both Y beams in place: rails underneath on both, backers on top on both.

tip Tip

The CAD C extrusion is 350 mm with a 300 mm rail (250 machine); yours is the 350-kit C with a 400 mm rail.

pause Good stopping point · ~35 min since the last one

both titanium Y backers screwed down flat on the rail-opposite face. Check nothing is cammed out before you stop.

Source: Ti extrusion-backers README (tanaes) · CAD: Voron 2.4r2 STEP @ de7e89d