Step 11.67 — Shut down, unplug and prove it dead¶
Step 1 of 67 · Chapter 11 — Skirts, panels, Clicky-Clack door, filtration
(no image — see text)
Gather for this segment — steps 11.67–11.4 (~25 min)
Fasteners, Tools & Misc box
- M3×5×4 heat-set insert ×27
Printed parts
[a]_fan_grill_retainer×2 · bin 11-fansfront_skirt_a_350×1 · bin 11-skirtsfront_skirt_b_350×1 · bin 11-skirtsrear_center_skirt_350×1 · bin 11-skirtskeystone_panel×1 · bin 11-skirtsside_skirt_a_350×2 · bin 11-skirtsside_skirt_b_350×2 · bin 11-skirtsside_fan_support×2 · bin 11-skirts
Tools and consumables
- multimeter
Already on the bench
- the BTT
mount, taped to the front extrusion · bin 10-tft power_inlet_IECGS_1mm, already on the frame · bin 09-bay- the two bay fans
Parts:
- multimeter · tool
Do:
- Shut the Pi down from Mainsail; wait for its green ACT LED to stop.
- Rocker off; unplug wall, then inlet; cord out of the room.
- Once the PSU LED is dark, meter DC V, +V to −V.
Check
Rocker unlit, PSU LED dark, no cord at the inlet. The meter reads 0 V and holds it for ten seconds, as at 10.73.
What you're looking at
Everything in Part A is done with the machine open, unplugged, and, in the build order, after Ch 12 Part 2, which left it powered with the bay open. So Part A opens with 11.67: shut down, unplug and prove it dead before any hand goes into the bay. Nothing in Part A needs power; the next power-on is Ch 13's 13.3, the first time the machine moves and heats. Work through it, then stop at the marker before 11.52. Three runs are off-machine: the touchscreen module (11.5–11.6) is built from Ch 10 Step 10.50, before its ribbon is latched; the Nevermore (11.26–11.41, after B09) and the Clicky-Clack sub-assembly (11.44–11.50, after B10) can be done any time after their batch has printed — for instance while Ch 12 flashes images.
Checkpoint 12 left the machine live with the bay open. Part A reaches into the bay, tips the printer on its side and plugs a fan lead into the Leviathan, so it starts dead. The PSU's green LED sits beside its voltage-adjust pot.
Caution
Who is in the room, 00a.2: one adult at the machine, bay open and live, until this Check passes. She stays out of the room until the meter holds 0 V and the cord is gone.
Caution
Stays dead through Part A. Nothing here needs power. If a step tempts you to check something live, stop: the next plug-in is Ch 13's hand-on-the-switch power-on at 13.3, with the bay closed. At every Pause, the cord stays out of the room. src
Source: LDO wiring guide § Checkpoint 1 · Voron docs — Electrical Wiring · Mean Well LRS-200 datasheet — LED beside +V ADJ. · Ch 00a Step 00a.11