Batch B11 › After the kit-day measurements10 / 14

Step B11.10 — Measure the gaps the custom pieces fill

Step 10 of 14 with a helper · Batch B11 — Bay ducting (PETG V0)

(no image — see text)

Do: Kit day, deck panel loose:

  1. Dry-lay the rails, PSU, SSR, Leviathan and P2 and P3 pieces per the overlay.
  2. Caliper the rows below.
  3. String LDO's duct route from the notch to HV-STEPPER-1 and HV-STEPPER-0; log both.

check Check

Every row entered, both string lengths logged. The gap row decides P5, the SSR row the stub, regenerated at B11.11 only from 112 mm.

helperHelper Reads each caliper number back aloud and writes it into the log.

B11 bay gaps — what P4 and P5 are cut to — the calculator needs JavaScript; the limits are in the table on this page.

tip Tip

The bed TH, probe, filter-fan leads and Bed L route in Ch 10; the probe and filter fan aren't built until Ch 09 and Ch 11. Fit confirms then.

pause Good stopping point · ~20 min since the last one

the bay is dry-laid and measured; nothing is stuck down or fastened.

Source: review/2026-09-23-bay-mods/layout-v3/layout-v3.md § Clearance and bench checks, checks 3, 5, 7 and 16 · layout-v2/layout-v2.md bench check 2 · layout-v3/overlay-v3.jpg