Skip to content
Ch 00 › Workspace11 / 32

Step 00.11 — Bin the workspace by chapter

Step 11 of 32 pre-kit with a helper · Chapter 00 — Before you start

(no image — see text)

Parts:

  • A5 mesh zip bag ×29 · consumable
  • B5 mesh zip bag ×6 · consumable
  • box for the skirt ring ×1 · consumable
  • spare bins for the LDO-supplied parts and the greased rails · consumable
  • masking tape · consumable
  • scissors · tool
  • marker · tool

Do:

  1. Print the bin labels, two per sheet. Cut, trim each to its frame, slide it into its bag.
  2. 33 bins, 00-jigs … spare-alt: 29 of 48 A5 and 6 of 12 B5 mesh bags, plus 1 box.

check Check

33 bins bagged or boxed and labelled, the batch-to-bin map posted where you sort, plus bins for the LDO-supplied parts and the greased rails.

helperHelper Trims each label to its frame and slides it into the bag it names.

What you're looking at

Bags, a box and labels. Each bin belongs to one sub-assembly, not to a whole chapter: Ch 02 alone builds four identical-looking corners that must not get mixed. Parts land in their bin as they arrive, so a session never starts with a hunt.

Print batch Bins it fills
B00 — Calibration & jigs 00-jigs, 02-Z0
B01 — Z drive assemblies 02-Z0, 02-Z1, 02-Z2, 02-Z3, 02-deck
B02 — The accent day (all accent parts) 02-Z0 … 02-Z3, 04-A, 04-B, 05-XY, 06-Z-joints, 07-X, 08-SB, 08-CW2, 10-chains, 10-tft, 11-skirts, 11-fans, 11-door, spare-alt
B03 — A/B drive units + front idlers 04-A, 04-B
B04 — XY joints + X carriage 05-XY, 07-X
B05 — Z joints + Z chain 02-Z0 … 02-Z3, 06-Z-joints, 10-chains
B06 — Toolhead 08-SB, 08-CW2, spare-alt
B07 — Electronics bay + lighting 08-CW2, 09-bay, 10-lights, 11-finish, spare-alt
B08 — Skirts and front modules 10-tft, 11-skirts
B09 — Panels, filtration, spool 11-panels, 11-clips-4mm, 11-finish, 11-clips-6mm, 11-nevermore, 11-spool
B10 — Clicky-Clack door 11-door
B11 — Bay ducting (PETG V0) 09-ducts-DC, 09-ducts-AC, 10-lids-AC, 11-lids-DC
Add-ons after kit day, on no plate 13-scrubber, 14-exhaust

tip Tip

29 A5 bags are needed and 24 are on hand: buy one more pack of A5 mesh bags, 24 to a pack. The B5 stock covers its 6.

pause Good stopping point · ~25 min since the last one

since the last pause (pre-kit) — the tool and consumable decisions are made, the flat reference is verified and masked off, and the bins are labelled. Steps 00.7 and 00.12 wait for the kit.

Source: print plan · survey