Skip to content
Ch 012 / 22

Step 01.2 — Sort the extrusions by length

Step 2 of 22 with a helper · Chapter 01 — Frame

Full page

Tap to enlarge

Parts:

  • A extrusion ×10 · set out now, fitted later
  • B extrusion ×4 · set out now, fitted later
  • C extrusion ×2 · set out now, fitted later
  • D extrusion ×1 · set out now, fitted later
  • E extrusion ×1 · set out now, fitted later
  • masking tape · consumable
  • marker · tool

Do:

  1. Lay every extrusion out and sort by length.
  2. Label each group A/B/C/D/E with masking tape.
  3. Bag C, D and E separately, labelled for Ch 05: manual p.85, p.88, p.101.

check Check

10 A, 4 B, 2 C, 1 D, 1 E. Only the four B extrusions have small round access holes near each end.

helperHelper Sorts the extrusions into piles by length and counts each pile aloud.

What you're looking at

Manual p.13 lays the eighteen extrusions out by length. These 2020 extrusions are 20 × 20 mm aluminium bars with a T-slot down each face. A is the horizontal, B the vertical, C / D / E the gantry in Ch 05.

Source: Voron manual p.13