Skip to content
Ch 0530 / 48

Step 05.30 — Build the left XY joint

Step 30 of 48 · Chapter 05 — Gantry: X and Y axes, XY joints, X carriage, titanium backers

Tap to enlarge

gather Gather for this segment — steps 05.30–05.31 (~20 min)

Motion box

  • F695 bearing ×2
  • GT2 20-tooth idler ×1

Fasteners, Tools & Misc box

  • M5×40 SHCS ×4
  • M5 precision spacer ×2

Printed parts

  • xy_joint_left_upper_MGN12 ×1 · bin 05-XY

Already on the bench

  • xy_joint_left_lower_MGN12 with its three M5 nuts · bin 05-XY

Parts:

  • xy_joint_left_upper_MGN12 ×1 · bin 05-XY
  • xy_joint_left_lower_MGN12 with its three M5 nuts · already on the bench
  • M5×40 SHCS ×1 · Fasteners, Tools & Misc box
  • F695 bearing ×2 · Motion box
  • M5 precision spacer ×2 · Fasteners, Tools & Misc box

Do: Mirror of Steps 05.26–05.27: M5×40 up through the upper plate, then spacer, F695 flange down, F695 flange up, spacer. Close the joint body over it into its M5 nut. The left parts have no cable channel.

check Check

Left and right joints sit as mirror images on the bench, not as two of the same hand.

What you're looking at

The left joint, built exactly as the right was. The tell is the wire channel: only the right-hand pair has one. If the parts in your hand have a channel, put them down; they are the right joint's.

Source: Voron manual p.99