Skip to content
Ch 06 › Part A — Chapter 06: Z axis (mechanical)8 / 42

Step 06.8 — Repeat at all four corners

Step 8 of 42 · Chapter 06 — Z axis (and Chapter 06b — Gantry squaring)

Tap to enlarge

Parts:

  • the other three cut Z belts · already on the bench
  • the other three Z bearing blocks · already on the bench
  • [a]_z_belt_clip_lower_x4 ×3 · bin 06-Z-joints
  • M3×30 SHCS ×3 · Fasteners, Tools & Misc box
  • M5×30 BHCS ×3 · Fasteners, Tools & Misc box

Do: Repeat steps 06.5–06.7 at the other three gantry corners. Coil each belt tail loosely and tape it to its own Y extrusion so nothing gets trodden on during the lift.

check Check

Four blocks fitted, all four cutouts pointing outward, four belt tails clamped and coiled. Nothing on this gantry needs a magnet.

What you're looking at

The same stack at the other three corners. The manual leaves the belts out of these drawings, but you now have four long tails hanging off the gantry. A trodden-on belt is a re-cut belt, and there is only ~400 mm spare.

pause Good stopping point · ~40 min since the last one

all four first belt ends clamped under their gantry corners with the Z bearing blocks on. Gantry still on the bench, belts hanging free — coil each tail and tape it so nothing gets stood on.

Source: Voron manual p.113