Skip to content
Ch 07 › Capture the ends, pull tight, inspect28 / 39

Step 07.28 — Tighten the carriage bolts

Step 28 of 39 · Chapter 07 — A/B belts and tensioning

Full page

Tap to enlarge

Parts: none.

Do: Fully tighten the four M3×8 belt-clamp screws first, as p.141's middle panel shows. Then "Fully tighten the carriage bolts." These thread into plastic and captive nuts, so stop at solid (not specified — snug).

check Check

Pull hard on each belt at the carriage: nothing slips. The X carriage still runs the full X rail without fouling.

What you're looking at

Everything closed and firm at last. These screws go into printed plastic and captive nuts, so "solid" is the stopping point: the manual gives no torque figure, and a stripped insert here means splitting the carriage back open with both belts threaded through it.

pause Good stopping point · ~80 min since the last one

the long one, and it has no safe interior stop: both belts routed, both ends captured in the carriage, tails equalised and the carriage bolts tightened. Only stop here once the carriage is closed and both belts are held at both ends.

Source: Voron manual p.141