Skip to content
Ch 07 › Prepare the idlers and the X carriage5 / 39

Step 07.5 — Set both front-idler tensioners

Step 5 of 39 with a helper · Chapter 07 — A/B belts and tensioning

Full page

Tap to enlarge

Parts:

  • the two front-idler M3×40 SHCS · already on the bench
  • the two front-idler M3 washers · already on the bench

Do:

  1. Back each M3×40 out until the tension arm is at its slackest end of travel.
  2. Wind it back in exactly 4 turns. Count the turns and give both idlers the same number.

check Check

Both tensioner screws stand proud of the front idler bodies by the same amount, with travel left in both directions.

helperHelper Counts the four turns aloud on each tensioner so both idlers get the same number.

What you're looking at

The front-idler tensioners are the two blue parts at the front; each carries an M3×40 whose job is belt tension. Winding it in pulls the idler forward and tightens that belt, backing it out releases it. Both went on in Ch 04.

pause Good stopping point · ~25 min since the last one

both belt paths traced against p.126–127 and both front-idler tensioners backed out to the loose starting position. Nothing is cut. Do not start cutting belt unless you can also thread it.

Source: Voron manual p.128 · Voron docs § V2 Gantry Squaring, step 5