Ch 10 › Section 2 — Checkpoint #1, exactly as LDO writes it21 / 80

Step 10.21 — The SSR is open when unpowered

Step 21 of 80 · Chapter 10 — Wiring and Checkpoint #1

Parts:

  • multimeter · tool

Do: Measure SSR LOAD 1 → LOAD 2 with nothing energised.

Check

No beep, and INPUT 3/4 are still empty.

What you're looking at

With nothing on terminals 3 and 4 the relay's semiconductor switch must be off, so its two mains terminals should have no path between them. The close-up shows the terminals you are probing. It is a Rev C bay, so read only the SSR body.

Source: LDO wiring guide § Checkpoint 1 · LDO wiring photo SSR_Close_Up.jpg