Step 10.61 — Secure the A and B motor cables¶
Step 61 of 80 · Chapter 10 — Wiring and Checkpoint #1
Tap to enlarge
Parts:
- zip ties, 4 to 6 · consumable
Do: Bundle the A and B motor cables along the small extrusion between the two drive units, tying every 60–80 mm. Both bundles feed into the Z chain next.
Check
No cable can reach a moving belt or pulley. Ties are snug, not crushing.
What you're looking at
The A and B motor leads run from the two rear drive units along the small extrusion between them, then join everything else in the Z chain. The ties keep the cables out of the belts and pulleys.
Source: Voron manual p.200 · Video: Part 6 @1:04:55