Skip to content
Ch 11 › Part A — before Ch 13, machine unplugged3 / 67

Step 11.2 — Heat-set the skirt segments

Step 3 of 67 · Chapter 11 — Skirts, panels, Clicky-Clack door, filtration

Tap to enlarge

Parts:

  • M3×5×4 heat-set insert ×11 · Fasteners, Tools & Misc box

Do: Press an insert into every boss the page highlights: three in each front skirt and the keystone panel, one in each fan support's top rail. Part flat, insert square, same tip temperature as before.

Check

Every insert flush or just below, none proud, no bulge on the show face. An M3×8 SHCS turns in freely by hand.

What you're looking at

Heat-set inserts are brass M3×5×4 sleeves melted into a printed boss to give it a real metal thread. Both front skirts and the keystone panel take three each; each fan support takes one.

Tip

iron hot, do the rest: fans and retainers ×16 at 11.3, TFT mount ×2 at 11.5, Nevermore ×6 at 11.28, latch ×1 at 11.49, exhaust cover ×2 at 11.54. src

Source: Voron manual p.212 · LDO Rev D printed-parts guide