Skip to content
Ch 11 › Part B — after Ch 1367 / 67

Step 11.66 — Final seal and clearance check

Step 67 of 67 with a helper · Chapter 11 — Skirts, panels, Clicky-Clack door, filtration

Parts:

  • 6 mm extrusion slot cover, optional · consumable

Do:

  1. Peel any film. Close the door and check every seam for daylight.
  2. Push the gantry through full XY and Z by hand; nothing should touch.
  3. Confirm the touchscreen, AC switch, keystone and spool arm are clear.

check Check

No daylight at any panel seam or around the door, no contact in full XY or Z travel, the door latching with one push.

helperHelper Runs a finger round every panel seam and calls out any gap found.

What you're looking at

Nothing to fit. This is the whole enclosure as one object: five panels, a door, a skirt ring and a screen, all of which have to seal without touching anything that moves. The chamber temperature Ch 14's ASA work depends on is decided here.

tip Tip

trim and press the optional 6 mm slot cover into any empty extrusion slots you want to hide.

pause Good stopping point · ~15 min since the last one

hammerhead nuts thread-locked, every seal and clearance checked, machine closed. Ready for Checkpoint 11.

Source: Voron manual p.241 · Voron manual p.243 · KB3D Clicky-Clack install guide § Frame Assembly · survey §5.2 W11