Do:

  1. Open the GATE B bag and run Gate B.
  2. Caliper the z_drive_retainer_a 625-2RS pocket, then set seven KADRICK inserts.
  3. Kit day: thumb a real 625-2RS into that pocket, then slide the MGN12_rail_guide onto the real MGN12 rail.

Check

The pocket calipers 16.30 mm ±0.15 and all seven inserts sit flush. Bearing and rail rows sign off on kit day.

What you're looking at

A 625-2RS is the plain 16 mm bearing in every Z drive, and this pocket is the seat it presses into. The caliper now is standing in for that press: if the pocket is wrong, 22 h of Z-drive bodies would print wrong with it. Flush, un-bulged inserts mean the iron is right before any real part sees one. The adult sets the inserts; the helper never handles the iron.

coupon when passes when
z_drive_retainer_a 625-2RS pocket, calipered now reads 16.30 mm ±0.15 across the pocket
heat-set inserts now, on seven KADRICK M3×H5, one per pocket — the how-to is Ch 00 Steps 00.14–00.15, the same session flush to 0.2 mm proud, no boss bulge > 0.2 mm
insert count now the practice seven come out of the KADRICK kit; all 153 kit inserts stay for the build
the same pocket, on a real 625-2RS kit day, out of carton 1 thumb pressure seats it, no rocking
MGN12_rail_guide kit day, out of carton 1 seats with light finger pressure

Gate B — bore, inserts, and the kit-day rows — the calculator needs JavaScript; the limits are in the table on this page.

Caution

A pocket outside 16.30 mm ±0.15 is the profile, not the part. Confirm shrinkage compensation is 0 %, then move extrusion multiplier 1 %, reprint the retainer and the cube, re-pass Gate A, and only then start B01. A bulging boss is technique, so practise rather than re-slice. The six MGN9 rails stay sealed until rail prep.

Good stopping point · ~15 min since the last one

Gate B's caliper and insert rows are measured and written down; B01 and B03–B06 are released. Put the retainer in bin 02-Z0 and keep the rail guide in 00-jigs for the kit-day rows.

Source: 00-slicer-setup § Gate B · print plan §1.4 · Voron materials — shrinkage 100 % · LDO heat-set insert tool guide