Skip to content

While a long plate runs

Note · Batch B01 — Z drive assemblies

Seven plates in this build run past eight hours and one runs past fifteen. None of them wants watching, but all of them want three looks: the first layer, the corners after an hour, and once more at bedtime. A lifted corner is a stop, not a wait — abort, clear the sheet, renew the glue film and restart, rather than letting the plate print another six hours on top of it.

Revali asleep on a spool
Fifteen hours. Watch the first layer, then walk away. A champion can supervise from a spool.

The rest of the time the printer is working for you and the bench is free. In order of value: read the assembly chapter the running batch feeds, sort and label the previous plate into its bins, and print or write the bin labels you are still missing.