Batch B01Checkpoint
Checkpoint B01¶
Checkpoint · Batch B01 — Z drive assemblies
- Gate B passed before B01-P1 started (Step B00.7)
- Every
z_drive_main_a/bandz_drive_retainer_a/b625-2RS pocket calipers 16.30 mm ±0.15 - (kit day) a real 625-2RS presses into every
z_drive_main_a/bseat by thumb, no rocking - (kit day) a real 625-2RS presses into every
z_drive_retainer_a/bseat by thumb, no rocking - (kit day) Deck panel measured; correct deck-support thickness confirmed or
deck_support_4mm_x8reprinted - No corner lift or delamination on any
z_drive_mainbody - Bins 02-Z0–Z3 each hold one matched set of the right hand, bin id written on every part; 8 clips in 02-deck
Common mistakes¶
- Starting the 15.2 h P1 plate late in the day and having it finish unattended overnight with no chance to abort a bad first layer.
- Starting B01 on Gate A alone — Gate B's bore caliper is what protects these 22.8 h.
- Trying to make four identical sets from two
aand twobof each part — the sets are mirrored; the corner bins are not interchangeable. - Assuming the deck-support thickness without measuring the actual panel.
- Forcing a tight bearing seat with a press instead of reducing extrusion multiplier for the reprint.
Next¶
Assembly: Z Drives and Idlers (Ch 02), with B02's accent parts already on the shelf. Printing: B02 — Accent parts (blue), the colour change.