Skip to content
Batch B01Checkpoint

Checkpoint B01

Checkpoint · Batch B01 — Z drive assemblies

  • Gate B passed before B01-P1 started (Step B00.7)
  • Every z_drive_main_a/b and z_drive_retainer_a/b 625-2RS pocket calipers 16.30 mm ±0.15
  • (kit day) a real 625-2RS presses into every z_drive_main_a/b seat by thumb, no rocking
  • (kit day) a real 625-2RS presses into every z_drive_retainer_a/b seat by thumb, no rocking
  • (kit day) Deck panel measured; correct deck-support thickness confirmed or deck_support_4mm_x8 reprinted
  • No corner lift or delamination on any z_drive_main body
  • Bins 02-Z0–Z3 each hold one matched set of the right hand, bin id written on every part; 8 clips in 02-deck
Revali passing a gate
Batch B01 printed: plates 2 to 3 of 22, 26.8 of 157.0 h. 2 gummy worms.

Common mistakes

  • Starting the 15.2 h P1 plate late in the day and having it finish unattended overnight with no chance to abort a bad first layer.
  • Starting B01 on Gate A alone — Gate B's bore caliper is what protects these 22.8 h.
  • Trying to make four identical sets from two a and two b of each part — the sets are mirrored; the corner bins are not interchangeable.
  • Assuming the deck-support thickness without measuring the actual panel.
  • Forcing a tight bearing seat with a press instead of reducing extrusion multiplier for the reprint.

Next

Assembly: Z Drives and Idlers (Ch 02), with B02's accent parts already on the shelf. Printing: B02 — Accent parts (blue), the colour change.