Skip to content
Batch B02Checkpoint

Checkpoint B02

Checkpoint · Batch B02 — Accent parts (blue)

  • SB main body built-in supports removed clean; LED pockets crisp
  • Cable-chain bridge fit decision made (stock 2-hole vs Ti-backer remix) once Ti backers are in hand
  • Handle brim removed cleanly, no visible scarring
  • All 29 small accent parts present and in their bins (B02.9), ids written on the _a / _b parts
  • Blue spool re-sealed/dry-stored — no more blue prints in the build
Revali passing a gate
Batch B02 printed: plates 4 to 6 of 22, 48.7 of 157.0 h. 3 gummy worms.

Common mistakes

  • Suppressing the SB main body's built-in supports in slicer instead of leaving them as designed.
  • Slicing the Ti-backer cable bridge standing up because it didn't auto-lay-flat.
  • Setting a global brim to "make sure" Handle gets one — it already has one; the global setting brims every grill on the plate.
  • Mixing up which a / b part goes to which corner or side — letter every _a / _b part as it comes off the plate, before anything is bagged.
  • Skipping the full purge on the blue colour change and getting black-streaked accent parts.

Next

Assembly: accent half of Z Drives and Idlers, A/B Drives and Idlers, Gantry, Stealthburner, Skirts and the Clicky-Clack door — as their black counterparts complete. Printing: back to Galaxy Black for B03 — A/B drive units + front idlers, and on through B10 in numeric order — the whole run is finished before the kit lands.