Skip to content
Batch B07Checkpoint

Checkpoint B07

Checkpoint · Batch B07 — Electronics bay + lighting

  • COB mount halves close flush on 2× M3×6 FHCS, all eight assemblies
  • COB mounts checked flat on granite reference — no rocking
  • Wago mount heat-set bosses crisp (inserts go in at Ch 09)
  • PSU_stabilizer_50mm fit decision made (verify against actual PSU)
  • power_inlet_IECGS_1mm off B07-P1 flat, brim snapped off cleanly, binned for Ch 09
Revali passing a gate
Batch B07 printed: plates 11 to 12 of 22, 100.3 of 157.0 h. 2 gummy worms.

Common mistakes

  • Printing raspberrypi_bracket or rs25_psu_bracket out of habit from other Voron builds — this kit needs neither.
  • Skipping the flat-reference check on COB mounts and only discovering warp at final assembly.

Next

Assembly: Electronics (p.148–173), Controller (p.174–179), Wiring (p.180–211) — on kit day, out of bins 09-bay and 10-lights; the USB adapter cover waits in 08-CW2 for Ch 08 and the handlebar spacers in 11-finish. Printing: straight on to B08 — Skirts and front modules.