Batch B0810 / 11
Step B08.10 — Inspect¶
Step 10 of 11 · Batch B08 — Skirts and front modules
(no image — see text)
Do: Lay every skirt segment from all four plates on the flat granite reference; check each for rocking.
Dry-fit the full ring: front front_skirt_a + TFT mount + front_skirt_b; rear rear_center_skirt +
power_inlet from B07 + keystone_panel; each side side_skirt_a + side_fan_support + side_skirt_b.
Check
No rocking on any segment. Ring dry-fits with consistent gaps at every joint.
Good stopping point · ~20 min since the last one
every segment checked flat, brims off, ring dry-fitted and taken apart again. Nothing bolted.
Source: print plan §5.2 — checkpoint after each batch · 00-slicer-setup § Calibration sequence · Prusa KB — Warping