Batch B10Checkpoint

Checkpoint B10

Checkpoint · Batch B10 — Clicky-Clack door

  • (kit day) Split bushings tap into hinge sleeves without splitting the part
  • (kit day) M5×45 dowel pin is a tight hammer fit into Hinge-L-solid, ~20 mm proud
  • Door swing decided from where the machine will live (as designed: hinges left, opens from the right); hinge files mirrored only if it must open the other way
  • Blue Handle (B02) reunited with the black hardware for assembly
Revali passing a gate
Batch B10 printed: plate 22 of 22, 157.0 of 157.0 h. 1 gummy worm.

Common mistakes

  • Mirroring the Hinge-L-* parts "to be safe" — as designed the hinges are on the left; mirror only if the machine's left side will be against a wall.
  • Pressing the M5×45 dowel pin in loose instead of a tight hammer fit — the door will rack.
  • Printing the stock Voron/LDO door parts alongside Clicky-Clack "just in case."

Next

Assembly: door hinges and handle in Ch 11 Part A (Steps 11.46–11.50), the door hung in Part B. Printing: this is the last plate of the ASA run. All 22 are done and binned, weeks before the cartons land. B11's P1–P3 (PETG V0) can print now; P4 and P5 wait for the kit-day bay measurements. The only ASA job left is a deck_support_4mm reprint if the deck panel calipers 4 mm.