Step 00.3 — Inventory carton 1, box by box¶
Step 3 of 32 with a helper · Chapter 00 — Before you start
(no image — see text)
Parts:
- Cable Kit 2.4-350 box · set out now, fitted later
- Motion box · set out now, fitted later
- Electronics 1 box · set out now, fitted later
- Electronics 2 box · set out now, fitted later
- Fasteners, Tools & Misc box · set out now, fitted later
- Belts, Chains & Fans box · set out now, fitted later
- Linear Rail Kit box · set out now, fitted later
- Frame Kit 2.4-350 box · set out now, fitted later
- Motor Kit box · set out now, fitted later
- C13 power cord ×1 · Other box
- PVC wire duct ×5 · consumable
- Revo HF hotend ×1 · Other box
- DIN rail ×2 · Other box
- Leviathan mainboard ×1 · Other box
- Meanwell LRS-200-24 PSU ×1 · Other box
- extrusion slot cover ×9 · consumable
Do:
- Work one box at a time against the BOM and tick
Check1. - Count each fastener bag closed, each board through its antistatic bag, each rail bag unopened.
- The counts below are the large, easy-to-be-short-on ones.
Check
Every BOM line ticked, or written down as short, and the frame and motor kits match the table above.
Helper Ticks each BOM line as you call out the count.
What you're looking at
Nine labelled boxes plus loose items: the mechanical and electrical half of the printer. The bags hold SHCS and BHCS screws, roll-in T-nuts and 153 brass heat-set inserts. The motors and extrusions in here are the frame and the four Z drives.
| Bag or kit | Count |
|---|---|
| M3×8 SHCS | 283 |
| M3 roll-in T-nut | 135 |
| M5 roll-in T-nut | 80 |
| M3 hammerhead | 75 |
| M5 precision spacer | 46 |
| Heat-set insert M3×5×4 | 153 |
| Zip tie | 100 |
| Frame kit, 18 extrusions | 340E ×1, 430D ×1, 450C ×2, 470A ×10, 530B ×4 |
| Motor kit, 7 motors | 1× 36STH20 E, 2× 42STH48-2004MAH A/B 0.9°, 4× 42STH48-2004AC Z 1.8° |
Caution
Rev D+ / LDO: in the Cable Kit box, read the labels on the XY endstop cable now. LDO documents a batch where they read "X Stop / Y Stop" instead of "XES / YES" and need re-pinning before they will work. Finding this in Ch 10 with the bay half-closed is much worse than finding it now. src
Source: LDO 350 Rev D BOM · LDO XY endstop cable guide · Video: Part 1 @0:03:01 (differs: pre-release Dec-2021 LDO kit — printed parts, packaging and some hardware were revised before Rev D)