Skip to content
Ch 018 / 22

Step 01.8 — Add the remaining three verticals and close the bottom square

Step 8 of 22 with a helper · Chapter 01 — Frame

Full page

Tap to enlarge

Parts:

  • B extrusion ×3 · Frame Kit 2.4-350 box
  • A extrusion ×2, prepared · already on the bench
  • M5×16 BHCS ×6, already in the A extrusions · already on the bench

Do: Repeat Step 01.7 at the other three corners, working around the frame, adding the last two bottom A extrusions as you go. Access holes outward every time. Snug only.

check Check

Bottom square closed, four verticals standing, 8 of the 16 blind joints engaged. The assembly still sits flat on the stone with no rock.

helperHelper Holds each vertical upright while you slide it over the bolt heads.

What you're looking at

Manual p.16 shows the other three verticals and the last two bottom horizontals, closing the base into a rectangle. Everything stays snug rather than tight so the assembly can still be nudged square before anything locks.

Source: Voron manual p.16