Step 06b.16 — Hand off: RESTART, then back to Ch 13 Step 13.35 — panels (Ch 11 Part B) and Ch 14's final tension and hot lock-in come after

Step 42 of 42 · Chapter 06 — Z axis (and Chapter 06b — Gantry squaring)

(no image — see text)

Parts: none.

Do:

  1. Run RESTART, so the idle timeout from 06b.1 returns to the config default.
  2. Go back to Ch 13 Step 13.35 and finish Ch 13.
  3. Leave the four M5×40 light: nothing set in this part is final.

check Check

RESTART completed, SET_IDLE_TIMEOUT back to the config default, the four M5×40 still light, and the gantry holding its height.

What you're looking at

Voron's steps 14–17, the heat soak, the hot QGL runs and the hot tighten, need a chamber that closes, and the panels are not on yet. So squaring stops here, cold: gantry square and de-racked, Z joints light, A/B belts at a working tension.

Voron step 17, done now rather than in Ch 14 because the M5×40 stay light for days, not minutes. That step is G28, re-QGL, Z=0, bed mesh and the first cube. Then fit the back, side and top panels and the Clicky-Clack door (Ch 11 Part B). Final A/B and Z belt tension, cold and door open at 14.4–14.5, then the heat soak, the 3–5 hot QGL runs and the hot tighten of the four M5×40 Z-joint bolts at 14.6, are Ch 14 Part B.

Source: Voron docs § V2 Gantry Squaring, steps 14–17 · Ch 14 Part B — Belts, final tension · Ch 11 Part B