Skip to content
Ch 08 › B — Clockwork 2 extruder26 / 65

Step 08.26 — Fit the cable-bridge bolt

Step 26 of 65 · Chapter 08 — Toolhead: Stealthburner, Clockwork 2, Revo HF, Nitehawk-SB V2

Full page

Tap to enlarge

Parts:

  • M3×8 SHCS ×1 · Fasteners, Tools & Misc box

Do: Drive the M3×8 SHCS into the cable-bridge position on the side of the extruder: the second fixing that ties the anchor and the cable path to the body.

check Check

The anchor no longer twists when you push it sideways.

What you're looking at

The cable-bridge bolt is the anchor's second fixing. On one bolt the anchor can twist; on two the cable path is rigid, which is what a drag chain tugging at it needs.

pause Good stopping point · ~25 min since the last one

Clockwork 2 is a complete, self-supporting sub-assembly: mesh set, both motor bolts tight, chain anchor and cable bridge fitted. The tension arm's M3×25 is deliberately loose and is a hinge pin — do not torque it to tidy the assembly up before you walk away.

Source: SB manual p.32