Skip to content
Ch 0915 / 36

Step 09.15 — Fit the printed DIN brackets to the PSU

Step 15 of 36 · Chapter 09 — Electronics bay

Full page

Tap to enlarge

Parts:

  • Meanwell LRS-200-24 PSU ×1 · Other box
  • lrs_200_psu_bracket_x2 ×2 · bin 09-bay
  • M4×6 BHCS ×4 (verify on bench) · Fasteners, Tools & Misc box

Do: Sit the two brackets on the PSU's long face, the one without vents, over the factory M4 holes, and drive M4×6 BHCS. Both must face the same way so their DIN hooks line up. No longer screws.

Check

Both hooks parallel and coplanar, terminal block on the edge that will face the SSR. On a rail offcut, both hooks engage at once.

What you're looking at

The two printed brackets are the PSU's entire mounting system. They screw into the factory M4 holes on its solid, unvented face and give it two DIN hooks. Screws longer than M4×6 reach inside a 200 W mains supply.

Caution

Rev D+ / LDO: the manual's "24 V PSU" here is a generic block. Yours is the Meanwell LRS-200-24 and these two printed brackets are the whole mounting system for it. src

Source: Voron manual p.153 · LDO wiring guide § Preparing the power supply unit · LDO 350 Rev D BOM · Video: Part 8 @0:37:04