Step 09.15 — Fit the printed DIN brackets to the PSU¶
Step 15 of 36 · Chapter 09 — Electronics bay
Tap to enlarge
Parts:
- Meanwell LRS-200-24 PSU ×1 · Other box
-
lrs_200_psu_bracket_x2×2 · bin 09-bay - M4×6 BHCS ×4 (verify on bench) · Fasteners, Tools & Misc box
Do: Sit the two brackets on the PSU's long face, the one without vents, over the factory M4 holes, and drive M4×6 BHCS. Both must face the same way so their DIN hooks line up. No longer screws.
Check
Both hooks parallel and coplanar, terminal block on the edge that will face the SSR. On a rail offcut, both hooks engage at once.
What you're looking at
The two printed brackets are the PSU's entire mounting system. They screw into the factory M4 holes on its solid, unvented face and give it two DIN hooks. Screws longer than M4×6 reach inside a 200 W mains supply.
Caution
Rev D+ / LDO: the manual's "24 V PSU" here is a generic block. Yours is the Meanwell LRS-200-24 and these two printed brackets are the whole mounting system for it. src
Source: Voron manual p.153 · LDO wiring guide § Preparing the power supply unit · LDO 350 Rev D BOM · Video: Part 8 @0:37:04