Skip to content
Ch 10 › Section 1 — Mains: inlet → switch → PSU → SSR → bed heater11 / 80

Step 10.11 — Live from the WAGO bus → SSR LOAD 2

Step 11 of 80 · Chapter 10 — Wiring and Checkpoint #1

Parts:

  • SSR to Wago cable ×1 · the Cable Kit box

Do:

  1. Strip the TO SSR end to 11 mm; land it in a spare port of the brown L WAGO.
  2. Feed it down the port stub and SSR run.
  3. Ferruled end on SSR terminal LOAD 2, PH2 tight.

Check

Continuity from the C14 L pin, rocker ON, through to SSR terminal 2. Nothing on terminal 1 yet.

What you're looking at

The SSR to Wago cable is one of the kit's pre-made mains leads: a bare stripped end for the WAGO lever, and a ferruled end for the relay, its crimped sleeve turning stranded wire into a tube a screw can clamp.

LDO layout

the cable runs from the WAGO bus along LDO's rear PVC duct to the SSR, as the mapping photo shows. LDO § Connecting 24V

Source: LDO Rev D photo S4 24 V/SSR mapping · LDO wiring guide § Connecting 24V · Video: Part 8 @1:24:57