Skip to content
Ch 10 › Section 4 — Above deck: probe, endstops, nozzle probe, lighting31 / 80

Step 10.31 — Read the XY endstop cable labels

Step 31 of 80 with a helper · Chapter 10 — Wiring and Checkpoint #1

Parts:

  • XY endstop cable ×1 · set out now, fitted later

Do: Read the two 3-pin connectors' labels.

check Check

Read the two 3-pin connectors and match one row.

helperHelper Reads both 3-pin labels aloud and points to the matching row in the table.

What you're looking at

One cable carries both limit switches: a single 4-pin plug at the gantry end that splits into two 3-pin plugs at the mainboard end. The photo is LDO's side-by-side of a correctly labelled cable and one from the mis-labelled batch.

Labels read Meaning
XES and YES correct cable — go to step 10.33
X Stop and Y Stop known bad batch — do step 10.32 first

Caution

Rev D+ / LDO: a mis-pinned cable will not damage the Leviathan, but X and Y homing simply will not work and you will not find out until Ch 13. Check now. src

Source: LDO wiring guide § Wiring the XY endstop · LDO XY endstop reconnecting guide