Skip to content
Ch 11Note

⛔ Stop here until Ch 13 is complete

Note · Chapter 11 — Skirts, panels, Clicky-Clack door, filtration

Everything above is done with the machine open. Do not fit the back, side or top panels or hang the door yet.

Ch 12 Part 2 (12.11–12.37) is already done — the boards were flashed and configured with the bay open, before this part closed it. Go now to Ch 13 (initial startup) — which includes the Ch 06b gantry-squaring pass and a QGL re-run. All of it needs the machine reachable from every face: STEPPER_BUZZ per motor, the XY endstop and homing checks, bed locating and the 0,0 point, PROBE_ACCURACY, dropping the Z joints and releasing the A/B tensioners for squaring.

Come back here at 11.52 once Ch 13's Finish page is done. The rest of this chapter is about 1.0–2.0 h.

Sub-sections that wait for Ch 13: 11.52–11.55 (back panel and exhaust), 11.56–11.58 (side panels), 11.59–11.60 (top panel and handlebars), 11.61–11.65 (Clicky-Clack door hung on the machine), 11.66 (final seal check).