Skip to content

Step B03.4 — Inspect

Step 4 of 5 · Batch B03 — A/B drive units + front idlers

(no image — see text)

Do:

  1. Now: caliper each drive frame half's F695 flange seat, a 15.00 mm pocket 4.00 mm deep.
  2. Now: dry-fit each drive unit's two halves, which must close flat.
  3. Kit day: drop a real F695-2RS in, no rocking.

check Check

Every seat reads 15.00 mm ±0.15 and both halves close with no visible gap.

pause Good stopping point · ~10 min since the last one

seats calipered, halves dry-fitted and separated again. Nothing pressed for keeps; the bearings themselves are a kit-day row.

Source: print plan §5.2 — checkpoint after each batch · 00-slicer-setup § Gate B · LDO Build Notes / FAQ