Batch B105 / 6
Step B10.5 — Inspect¶
Step 5 of 6 · Batch B10 — Clicky-Clack door
(no image — see text)
Do:
- Snap the five brims off; check the bases for scarring.
- On kit day, tap a split bushing into each hinge sleeve.
- Test-fit an M5×45 dowel pin into a
Hinge-L-solidhalf: very tight hammer fit, ~20 mm proud.
Check
Brims off clean. Kit day: no splitting on the sleeve press; pin fit is tight, not loose, with the correct proud length.
Good stopping point · ~10 min since the last one
brims off, parts bagged; the bushing and pin tests wait for the kit.
Source: print plan §5.2 — checkpoint after each batch · 00-slicer-setup § Calibration sequence · Clicky-Clack door README