Skip to content
Batch B11 › After the kit-day measurements14 / 14

Step B11.14 — Sort the after-kit plates into bins

Step 14 of 14 with a helper · Batch B11 — Bay ducting (PETG V0)

(no image — see text)

Do: Snap each lid on once, then sort off the diagrams: bodies to 09-ducts-DC or 09-ducts-AC, lids to 10-lids-AC or 11-lids-DC.

check Check

P4 sorted 6, 3, 3 and 6 into 09-ducts-DC, 09-ducts-AC, 10-lids-AC and 11-lids-DC; P5 or the fallback into the DC two.

helperHelper Reads each bin label aloud and checks the count against the diagram.

B11-P4

bin parts off this plate
09-ducts-DC — DC conduit + coupon, B11 V2L_58mm_DUCT ×3, V2L_130mm_DUCT, V2L_70mm_DUCT, V3L_10mm_DUCT
09-ducts-AC — AC conduit, B11 V3L_10mm_DUCT ×2, V3L_34mm_DUCT_HOLE
10-lids-AC — AC lids + strip fin, B11 V3L_10mm_DUCT_COVER ×2, V3L_34mm_DUCT_COVER
11-lids-DC — DC lids, B11 V2L_58mm_DUCT_COVER ×3, V2L_130mm_DUCT_COVER, V2L_70mm_DUCT_COVER, V3L_10mm_DUCT_COVER

B11-P5

bin parts off this plate
09-ducts-DC — DC conduit + coupon, B11 V3L_154N_DUCT ×2, V3L_T_REG_N ×2
11-lids-DC — DC lids, B11 V3L_154N_DUCT_COVER ×2, V3L_T_REG_N_COVER ×2

Fallback, printed instead of B11-P5 (gap under 25 mm)

bin parts of the fallback
09-ducts-DC — DC conduit + coupon, B11 CMD_V3_1H_T_REG ×2, CMD_V3_1H_82mm_DUCT
11-lids-DC — DC lids, B11 CMD_V2_6B_T_REG_COVER ×2, CMD_V2_6B_82mm_DUCT_COVER

Before the next ASA plate

smooth sheet back on, and Settings → Chamber Filtration reads Adv. Filtration. On None the AFS blower never runs and ASA vents unfiltered.

pause Good stopping point · ~10 min since the last one

all of B11 is binned for Ch 09. Smooth sheet back on, Chamber Filtration on Adv. Filtration.

Source: print/README § Bins