Step B11.2 — Pre-print checks¶
Step 2 of 14 · Batch B11 — Bay ducting (PETG V0)
(no image — see text)
Do: Door closed, Chamber Filtration left on Adv. Filtration. Watch the rear bypass flaps once the plate starts.
Check
The flaps lift within the first minutes and the chamber settles near 35 °C (verify on bench).
Tip
If the flaps stay shut, set Chamber Filtration to None by hand for this plate; the chamber fans then lift them. Set Adv. Filtration again when it ends.
Source: slicer/OVERRIDES.md § Bay-duct bundle · Prusa KB — PETG