Skip to content
Batch B11 › Before kit7 / 14

Step B11.7 — Inspect the before-kit plates

Step 7 of 14 · Batch B11 — Bay ducting (PETG V0)

(no image — see text)

Do: Snap every lid onto its duct once. Check each tine row for strings and each base for elephant foot.

check Check

Every lid seats along its full length; no tine is fused to its neighbour; bases are flat.

pause Good stopping point · ~10 min since the last one

before-kit parts inspected and bagged by plate.

Source: print plan §5.2 — checkpoint after each batch