Step B11.7 — Inspect the before-kit plates¶
Step 7 of 14 · Batch B11 — Bay ducting (PETG V0)
(no image — see text)
Do: Snap every lid onto its duct once. Check each tine row for strings and each base for elephant foot.
Check
Every lid seats along its full length; no tine is fused to its neighbour; bases are flat.
Good stopping point · ~10 min since the last one
before-kit parts inspected and bagged by plate.