Before you start Chapter 05¶
Before you start · Chapter 05 — Gantry: X and Y axes, XY joints, X carriage, titanium backers
Builds the complete gantry on the bench — XY bridge, both Y axes with their MGN9 rails, both XY joints, the X extrusion with its MGN12 rail, and the titanium extrusion backers — and ends with the X axis riding on the Y carriages. Unlocks Ch 06 (gantry install, Z belts, squaring).
What you're building in this chapter. The gantry is the entire moving upper half of the printer — a rectangle of aluminium extrusion that later hangs on four belts and slides up and down, with the toolhead riding inside it. Its back edge is the XY bridge, the cross-beam that carries the A and B motors you built in Ch 04. Two side extrusions, the Y axes, run forward from that bridge; each has a linear rail along one face and a front idler block at its front end that turns its belt back. Spanning the two sides is the X beam, capped at each end by an XY joint — the printed blocks that ride on the Y carriages and turn each belt around from its Y run to its X run. Bolted to the face opposite every rail are the titanium backers, flat strips that stop a steel rail bowing its aluminium extrusion as the chamber heats. Nothing in this chapter gets belts or squaring: both belong to Ch 06/07, and both would undo work done here.
Time: 5.0–7.0 h hands-on, first build, two people (survey §5.1 P05 / §7.2).
Sessions: 12 × ~30 min (first-build estimate; each Pause: line carries its own segment minutes).
Prerequisites:
- Ch 04 — A drive, B drive and both front idler assemblies built and checked (manual p.62–81). This chapter consumes them whole.
- Ch 00 — all seven rails cleaned and packed with grease before they go on an extrusion (LDO rail grease guide); jigs
Tools/MGN9_rail_guide_x2.stlandTools/MGN12_rail_guide_x2.stlprinted (batch B00). The rails still wear their Ch 00 end bands (Step 00.17) — they come off at Steps 05.11 / 05.33. - Print batches: B04 (XY joints + X carriage, plate B04-P1, 8.6 h, black) and B02-P3 (the blue accent plate — cable bridge, endstop pod and the four upper Z-belt clips) (print plan §B04). B04 needs Gate B (Step B00.7).
- Titanium backer set (Fabreeko/LDO, 350 size) unpacked and counted, plus 58 M3 roll-in T-nuts counted out from the kit bag: 29 for the rails and extrusion ends, 29 for the backers. The backer set ships none.
- Ch 01's bagged C ×2, D ×1, E ×1 extrusions.
Tools
- Hex drivers 2 / 2.5 / 3 / 4 mm; a ball-end 2.5 mm helps at the XY joints
- T10 Torx driver — strongly preferred for the backer M3 FHCS; hex cams out of a countersink easily (backers README)
- Printed rail-centring jigs
MGN9_rail_guide_x2,MGN12_rail_guide_x2 - Steel rule 300 mm and a caliper — to equalise the rail overhang at both ends
- Masking tape (carriage retention) and the kit's rubber rail stoppers
- 2.5 mm flat screwdriver (cable-chain latches, if you dry-fit the chain end)
Printed parts
Parts arrive in the bins named below (see the bin map in print/README.md#bins); check the bin label's list before you start.
| Looks like | STL | Bin | Qty | Colour |
|---|---|---|---|---|
xy_joint_left_lower_MGN12.stl |
05-XY | 1 | Black | |
xy_joint_left_upper_MGN12.stl |
05-XY | 1 | Black | |
xy_joint_right_lower_MGN12.stl |
05-XY | 1 | Black | |
xy_joint_right_upper_MGN12.stl |
05-XY | 1 | Black | |
[a]_xy_joint_cable_bridge_2hole.stl |
05-XY | 1 | Blue | |
XY_cable_chain_bridge-Igus-3mm_backer.stl |
05-XY | 1 (alternate — fit whichever clears the backer) | Blue | |
x_frame_V2TR_MGN12_left.stl |
07-X | 1 | Black — staged here, fitted in Ch 07 | |
x_frame_V2TR_MGN12_right.stl |
07-X | 1 | Black — staged here, fitted in Ch 07 | |
probe_retainer_bracket.stl |
07-X | 1 | Black — staged here, fitted in Ch 07/08 | |
[a]_endstop_pod_D2F_switch.stl |
05-XY | 1 | Blue — staged here, fitted at endstop wiring | |
[a]_z_belt_clip_upper_x4.stl |
05-XY | 4 | Blue — fitted here under the idler and drive M5×16 (p.91, p.93, p.95), loaded with belt in Ch 06 |
Do not print [a]_endstop_pod_hall_effect.stl, [a]_xy_joint_cable_bridge_3hole.stl, or any xy_joint_*_MGN9 — wrong variants for this kit (print plan §7).
Hardware (chapter totals)
| Fastener / part | Qty | Where |
|---|---|---|
| E extrusion (XY bridge) | 1 | p.85 |
| C extrusion (Y axis) | 2 | p.88 |
| D extrusion (X axis) | 1 | p.101 |
| MGN9H 400 mm rail | 2 | Y axes, p.88; carriage ships on the rail |
| MGN12H 400 mm rail | 1 | X axis, p.101; carriage ships on the rail |
| M5 roll-in T-nut | 26 | 8 in E (p.85), 12 in the C pair (p.89, p.90), 6 in D (p.102) |
| M3 roll-in T-nut | 29: 18 Y rails, 4 C-pair ends, 7 X rail | 9 per 20-hole MGN9 (p.88), 4 in the C pair (p.90), 7 for the 16-hole MGN12 (p.101) |
| M3 roll-in T-nut, backers | 29: 10 per Y backer, 9 on the X backer | from the kit's M3 roll-in bag; the backer set ships no T-nuts |
| M5×10 BHCS | 10 | 8 bridge-to-drive (p.86–87), 2 left XY joint (p.104) |
| M5×16 BHCS | 10 | 4 front idlers, through the upper Z-belt clips (p.91, p.93), 4 rear drive joints, same (p.95), 2 right XY joint + cable bridge (p.104) |
| M5×30 BHCS | 2 | XY joints from below (p.104) |
| M5×40 SHCS | 8 | 4 per XY joint (p.97–100) |
| M3×8 SHCS | 25: 18 Y rails, 7 X rail | one per marked rail hole (p.88, p.101): every other hole from the second, both end holes empty |
| M3×16 SHCS | 6 | XY joints to the Y carriages (p.106): 4 left joint, 2 right joint; all six fitted, none spare |
| M3×30 SHCS | 2: bagged with the endstop pod at 05.46, fitted at 09.33 | p.164 fits the pod through its body with 2× M3×30, not the M3×16 of p.106 |
| M5 nut | 6 | 3 per XY joint (p.96) |
| M5 precision spacer, brass | 4 | 2 per XY joint stack — one below and one above the F695 pair (p.97, p.99) — replaces the manual's "M5 shim" |
| M5 washer, black | 2 | under the M5×30 heads (p.104) — replaces the manual's "M5 shim" |
| F695 bearing | 4 | 2 per XY joint |
| GT2 20-tooth idler | 2 | 1 per XY joint |
| Titanium backer, Y — from Ti backer set | 2 | one per C extrusion |
| Titanium backer, X — from Ti backer set | 1 | D extrusion, rear face |
| M3×8 FHCS, Y backers — from Ti backer set | 20: 10 per Y backer | tanaes Y_backer-350 DXF: 10 holes (verify on bench) |
| M3×6 FHCS, X backer — from Ti backer set | 9 | tanaes X_backer_chain-350 DXF: 9 holes, plus 4 chain pilots (verify on bench) |
The West3D/Fabreeko titanium set ships 22× M3×8 FHCS and 10× M3×6 FHCS, two and one spare over the 20 + 9 holes, and no T-nuts (West3D).
Read first
- The titanium backers go on during this chapter, not after it. Fitting them once the gantry is assembled or installed means a teardown (survey §5.2 W2). They mount on the face opposite the rail — top of the Y extrusions, rear of the X extrusion. "If you have a single MGN12 but decide to put a backer on top, you will be actively contributing to the problem of bimetallic expansion!" src
- Do not tension the A/B belts and do not square the gantry here. Both are Ch 06/07, and the official squaring procedure begins by releasing A/B tension — tension it now and you undo it (survey §4.4 #2, §5.2 W1). Several joints in this chapter are deliberately left "slightly loose".
- Every T-nut this chapter needs must go in before the drive and idler frames cap the extrusion ends. LDO: "Due to the tight tolerances of the extrusions and roll-in t-nuts it is advisable to either test fit before assembly … or to pre-load the t-nuts into the extrusions." src
- Short a part? This chapter needs exact counts: 4 F695, 4 spacers, 2 20T idlers, the backer screws. Recount against your Ch 00 inventory sheet, then contact Fabreeko support; do not borrow from another chapter's bag.
- Rails ship dry. If Ch 00's clean-and-pack pass has not been done, stop and do it — the flip-and-pack method needs access to the back of the rail (survey §4.4 #5).
- Carriages slide off rails and are ruined by a drop (manual p.88, p.101). Tape or stopper every carriage the moment its rail is on an extrusion.
- Orientation. Through p.105 the gantry is built the way it runs — motors hanging down below the bridge, Y rails underneath (p.85, p.116). p.106 turns it upside down (motors up, rails up) so the X axis can be lowered onto the Y carriages; it stays that way to the end of this chapter and is turned back in Ch 06 (Step 06.11). Every step that turns it over says so.
Sources for this chapter:
- Voron 2.4r2 assembly manual, p.82–107 — the page sequence this chapter transcribes, pinned at commit
de7e89d - LDO Build Notes § Voron 2.4 build FAQ — Rev D kit deviations, T-nut pre-loading, rail stoppers
- LDO printed-parts guide (Rev D) — 2-hole cable bridge, D2F endstop pod
- LDO rail-grease guide — rail clean-and-pack, done in Ch 00
- LDO cable-chain guide — chain-end clearance over the backers
- Ti extrusion-backers README (tanaes) — which face the backers go on, and why; source of the two backer images (GPL-3.0)
- Fabreeko and West3D backer sets — supplied screw counts
- Voron docs § V2 Gantry Squaring — why nothing is squared or tensioned in this chapter
Video coverage (Steve Builds, pre-release LDO kit — differs from Rev D+): Part 3 @0:56:34 (+2m), Part 3 @1:19:23 (+16m), Part 3 @1:34:36 (+9m), Part 3 @1:43:29 (+5m), Part 4 @0:06:16 (+7m), Part 4 @0:34:10 (+9m), Part 5 @1:05:40 (+1m), Part 5 @1:20:27 (+13m)
Helper steps: 15 · 05.2, 05.4, 05.10, 05.11, 05.14, 05.16, 05.17, 05.24, 05.36, 05.40, 05.41, 05.42, 05.44, 05.46, 05.48